Back in October of 2008 I took a tour of the Schlitterbahn Vacation Village construction site. At that time the only major projects that had be done was the pouring of most of the conrete for the Torrent Tidal Wave attraction, and the installation of a large portion of the plumbing system. Since the latter was already buried, there wasn't a lot to see. Flash forward 6 months and the site has changed drastically. A lot of the dirt moving and leveling has been completed, there are concrete footers for some of the water slides (which should go vertical any day now), the concrete for Henry's Hideout (an adult hot tub with a swim-up bar) has been poured, and some of the play equipment has been installed in a few of the kiddie pools.